NUID Infrastructure Modernization Project (PL566)
January 16, 2023
The project will install 27.5 miles of gravity-pressurized, buried pipe; upgrade 153 turnouts; and construct four 1,000 cubic-yard retention ponds, each approximately 0.5 acres in size. The project will improve water conservation on District-operated laterals; improve water delivery reliability and drought resilience to NUID irrigators; reduce NUID’s operation and maintenance costs; reduce operational spills into natural waterbodies; and improve streamflow, water quality, and habitat in the Deschutes River.
Please click on the link below to read more information.
The project is estimated to start in October 2023.